Home About Us Services Projects Blog Reviews
Company
CNC machining Case study Privacy Policy Terms & Conditions Request a Quote
Home / Reviews
Client feedback

What supply chain teams say after the second order.

Feedback collected from programme managers, engineers and planners across 42 active programmes. Ratings are unedited.

Average rating4.8 / 5
Programmes42 active
On-time delivery99.1%
Repeat rate87%
“We moved two moulded housings to Irongrid and the first article matched our drawing inside tolerance. Zero line stops since.”
Marta LindqvistSupply Chain Manager · Axis Mobility
“Their DFM review saved our tool. Two rib changes would have caused sinks — we caught it before cutting steel.”
Daniel OkoyeHead of Engineering · Voltaris Medical
“99% on-time across 340,000 units last year. The weekly schedule call is the reason our planners trust them.”
Priya RamanOperations Director · Heliosteel
“Tool transfer in under a month. They re-qualified moulds another supplier had given up on.”
Tomas BergerProcurement Lead · Plasmatech
“Communication during the tool build was excellent. The only friction was packaging — we changed the carton spec after the first shipment.”
Ana FerreiraPurchasing Specialist · Nordvek
“The first quote was higher than our incumbent. The total cost was lower — fewer reworks, fewer expedited shipments.”
Johan MeyerFactory Manager · Kraftpart
Ready when you are

Send drawings today, get a quote in 24 hours.

Upload CAD files, share volumes and tolerances, and our engineering team returns a DFM-reviewed quote with tooling costs and lead time.